nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 8th October 2018 to Fri 12th October 2018
Overnight Engineering Works

Monday to Thursday:

The 22:25 Blackpool North to Manchester Airport service will terminate at Preston. An additional train service will run from Manchester Oxford Road at 23:50 to Manchester Airport.
The 22:35 Wilmslow to Liverpool Lime Street service will terminate at Manchester Oxford Road.
The 23:10 Wilmslow to Manchester Victoria service will be diverted between Manchester Piccadilly and Manchester Victoria, arriving at Manchester Victoria later than usual.
The 23:13 Blackpool North to Manchester Airport service will terminate at Preston. An additional train service will run from Manchester Oxford Road at 00:42 (Tuesday to Friday) to Manchester Airport.
The 23:31 Liverpool Lime Street to Manchester Victoria service will be replaced by a bus throughout.
The 23:46 Manchester Airport to Blackpool North service will terminate at Manchester Piccadilly.

Tuesday to Friday:

The 03:30 Blackpool North to Manchester Airport service will start from Manchester Piccadilly. [519]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.