nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 23rd July 2018 to Fri 27th July 2018
Overnight Engineering Works

Tuesday to Friday (mornings)
The 06:03 Stalybridge to Manchester Victoria service will be replaced by a bus throughout.
The 06:26 Manchester Victoria to Stalybridge service will be replaced by a bus throughout.
The 06:30 Stalybridge to Wigan North Western service will start from Manchester Victoria.
The 07:00 Stalybridge to Manchester Victoria service will be replaced by a bus throughout.

Monday to Thursday (nights)
The 22:18 Southport to Manchester Victoria service will not call at stations between Southport and Salford Crescent.
The 22:19 Blackburn to Wigan Wallgate service will terminate at Manchester Victoria.
The 22:50 Wigan North Western to Stalybridge service will terminate at Manchester Victoria. [507]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.