nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sat 24th February 2018 to Sun 25th February 2018
Manchester Victoria Closed

Saturday:
No TransPennine Express services will call at Manchester Victoria.
The 06:16 York to Liverpool Lime Street service will not run.
The 19:12 Liverpool Lime Street to Newcastle service will start from York.
The 23:20 Manchester Airport to York service will not call at Manchester Victoria, and will depart Manchester Piccadilly at 23:50.

Sunday:
Services between Liverpool Lime Street and Newcastle will be diverted to run between Manchester Piccadilly and Newcastle, and will not call at Liverpool Lime Street or Manchester Victoria.
The 09:12 Liverpool Lime Street to Newcastle service will start from Leeds.
The 20:12 Liverpool Lime Street to Scarborough service will start from Manchester Piccadilly. [503]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.