nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sun 18th February 2018
All Lines Closed At Bolton

Services that usually run between Southport / Wigan Wallgate to Chester / Hazel Grove will divert, and not run via Bolton.
Preston to Manchester Airport services will divert, and not call at stations between Clifton and Buckshaw Parkway.

Services between Clitheroe and Manchester Victoria via Bolton will not run. Instead, Manchester Victoria to Blackburn via Rochdale services will be extended to terminate / start from Clitheroe. [488]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.