nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Wed 27th December 2017
No Trains At Liverpool Lime Street

Trains will turn back at Huyton, Liverpool South Parkway or Hunts Cross. TPE services normally routed via Huyton will turn back at Manchester Victoria. [476]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.