nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sat 17th September 2011 to Sun 18th September 2011
Engineering Work Between Warrington Bank Quay and Preston

Saturday
The 23:02 Liverpool Lime Street to Preston service will terminate at Wigan Wallgate. A replacement bus will run from Wigan North Western to Preston.

Sunday until 15:00
Trains between Manchester Piccadilly and Chester will be diverted via Altrincham not calling at Manchester Oxford Road, Newton-le-Willows, Earlestown, Warrington Bank Quay, Runcorn East, Frodsham or Helsby. A replacement bus service will run between Manchester Piccadilly and Chester calling at these stations.
Buses replace trains between Wigan North Western and Preston. [33]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.