nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Sat 18th April 2015 to Sun 19th April 2015
Lines Via Salford Crescent Closed

Both Days
Trains between Manchester and Preston / Blackpool North / Barrow-in-Furness will be diverted between Deansgate and Preston and not call at Salford Crescent, Bolton, Horwich Parkway, Chorley or Buckshaw Parkway.

Saturday
Trains between Manchester Airport and Southport will run between Wigan Wallgate and Southport.
Trains between Todmorden / Manchester Victoria and Kirkby will run between Todmorden and Manchester Victoria and between Wigan Wallgate and Kirkby.
Trains between Manchester Victoria and Southport will be diverted via an alternative route and will not call at Salford Central, Salford Crescent, Swinton, Walkden, Atherton, Daisy Hill, Hindley and Ince.

Sunday
Trains between Chester / Hazel Grove / Stockport and Southport will be diverted and not call at Hindley and Salford Crescent.
The Manchester Oxford Road to Wigan Wallgate service will not run. [289]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.