Engineering Works Detail
Mon 5th May 2014 to Fri 9th May 2014 Overnight Engineering Works
Monday to Thursday
23:13 Blackpool North to Manchester Victoria, is diverted and will not call at stations between Leyland and Manchester Victoria. A bus will run from Preston to Manchester Victoria calling at stations normally served by the train.
Tuesday to Friday
03:38 Liverpool Lime Street to Manchester Airport, bus replaces train throughout.
04:38 Manchester Airport to Liverpool Lime Street, bus replaces train throughout.
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.
Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.
|