nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 7th October 2013 to Fri 11th October 2013
Overnight Engineering Works

Monday to Thursday

23:13 Blackpool North to Manchester Victoria is diverted between Preston and Manchester Victoria and will not call at Buckshaw Parkway, Chorley, Adlington, Blackrod, Horwich Parkway, Lostock and Bolton. A bus will run between Preston and Manchester Victoria calling at these stations.

Monday to Friday

03:38 Liverpool Lime Street to Manchester Airport is replaced by bus throughout
04:38 Manchester Airport to Liverpool Lime Street is replaced by bus throughout [164]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.