nw-sparks.co.uk

©2024 Phil Wieland

Engineering Works Detail

Mon 4th November 2013 to Fri 8th November 2013
Overnight Engineering Works

Monday to Thursday

23:20 Manchester Victoria to Wigan Wallgate is replaced by a bus throughout.

Tuesday to Friday

04:56 Blackpool North to Colne is replaced by a bus between Blackpool North and Preston departing Blackpool North at 04:15. [162]


National Rail
Information on engineering works is mostly provided by National Rail Enquiries. You are advised to check with National Rail Enquiries for the latest updates before travelling.

Timetable alterations for engineering works are published in two different ways: Some appear as Future Engineering Works on the National Rail web site, while others, especially changes for longer periods, are simply incorporated into the published timetables. The latter are harder to spot and may be missing from this list.